Technical Designer Data Center Construction (m/f/d)

We're looking for you!

Technical Designer Data Center Construction (m/f/d)

An expert is working on a data center blueprint.

About innovIT AG

innovIT AG is rethinking data centers: designed faster, built modularly and engineered with precision. Behind our solutions is a team with more than 15 years of experience in designing, building and operating data centers – with all trades in-house.

Our data centers are built from steel modules. We are looking for someone who turns our floor plans into production-ready drawings – and who wants to work with AI rather than against it.

Responsibilities

  • You turn our data center floor plans into a consistent, end-to-end design.
  • From these, you design the container modules for our production – shop and fabrication drawings in steel construction based on the existing structural analysis.
  • You plan cable trays and ducting and coordinate them with the steel construction.
  • A technical draftsperson supports you based on your specifications.
  • You spot clashes, gaps and inconsistencies yourself and raise them before they reach production.
  • You work with AI: at innovIT, Claude operates AutoCAD – you set the direction, review the results and help shape the way we work.

Qualifications

  • Vocational training as a technical systems planner (steel and metal construction), technician in steel or metal construction, or a degree in civil engineering with a focus on structural design
  • Several years of experience in shop and fabrication design in steel, modular or container construction
  • Proficient in Inventor, plus AutoCAD
  • Independent, structured way of working from your home office
  • Business-fluent German

A plus – and if not, you will learn it with us: experience with MEP cable routing, data centers, AutoLISP or scripting.

What we offer

  • Here you design what is moving the world right now: data centers for AI and data analytics – modular, energy-efficient and every project different
  • Fully remote: you work from home, on-site meetings only when needed
  • A draftsperson supporting you – so you can focus on the design
  • AI in CAD as everyday practice, not a vision of the future
  • An experienced team of infrastructure and data center specialists with flat hierarchies and short decision paths
  • Permanent employment contract and 30 days of vacation
  • Modern equipment with laptop and smartphone
  • Training and long-term prospects in a growing technology field

You don’t meet every requirement 100%? Send us your CV anyway and tell us why it could be a good fit! What matters is design experience in steel construction and an eye for detail – beyond that, initiative and curiosity count more for us than a perfect CV.

You’ll fit right in if …

  • you would rather raise problems early than deal with them late,
  • you like working independently and still want to be part of a team,
  • you are curious about new tools – including AI,
  • and a clean plan means more to you than a quick one.

We look forward to receiving your application at: bewerbung@innovit.ag.

Do you have any questions? Your contact is Jasmin Damann. Then just drop us a line.

Join our team and help us design the data centers of tomorrow.

Back to the job overview