Next-Generation Data Center
Infrastructure for AI workloads
AI applications place new demands on data centers. Training large models, GPU clusters, and data-intensive analysis processes require significantly higher power densities, a stable power supply, and high-performance cooling solutions. Traditional data center infrastructures often reach their limits in this regard. We develop AI modules specifically designed for high computing power, large data streams, and the continuous operation of modern IT applications.
This allows us to create an infrastructure in which GPU clusters, machine learning workloads, and HPC applications can be operated stably and efficiently. Our modules combine architecture, power supply, cooling, security, and monitoring into a single integrated system, thereby forming the technical foundation for high-performance AI infrastructure.
This results in a data center infrastructure that supports high power densities per rack and can be operated reliably and efficiently at the same time. Thanks to its modular design, new capacity can be rapidly deployed and scaled up as demands increase. Ideal for companies, research institutions, cloud providers, and operators who are building or operating high-performance infrastructure for AI workloads.
Our AI modules form the technical foundation for GPU clusters and AI platforms with high performance requirements.
Would you like to learn more about our AI modules or discuss a project?
We look forward to hearing from you.
Request an AI module
Are you planning your AI project?
We specialize in AI infrastructure projects that deliver maximum computing power. Energy-efficient. Prefabricated. Online in three to six months.
Advantages
AI-ready in 3–6 months
Technical Highlights
Designed for your AI workloads
- Datacenter in a Day – ready for operation immediately after installation
- Optimized for GPU clusters for training and inference
- Maximum efficiency for HPC up to 300 kW per rack
- Direct water cooling without the use of coolant
- Air cooling up to 50+ kW with free cooling
- 8-week delivery time, including pre-assembled data center equipment
- Can be installed with up to 6 racks without a building permit
- Standard components for worldwide service availability
- Transportability for flexible business models
- Also available as a complete solution with the latest hardware (NVIDIA)
Result
These technical requirements enable stable environments for training and running modern AI models.